Total Movements was appointed as the onshore logistics service provider for Navi Mumbai Metro coaches from Mumbai Port to Navi Mumbai Metro Depot. The consignments were manufactured by CSR Zhuzhou Electric Locomotive Co. Ltd., which were being supplied to CIDCO for the upcoming Navi Mumbai Metro Project at Taloja.

Cargo Details

DMC Metro Coach

Dimension:

22.8 m x 3.2 m x 4.1 m (LxWxH)

Weight :

44MT

TC Metro Coach

Dimension :

22.0 m x 3.2 m x 4.1 m (LxWxH)

Weight :

42 MT

Scope of Work

  • Receiving of metro coaches under vessel’s hook at Mumbai Port
  • Import Custom Clearance
  • Road transportation from Mumbai Port to Navi Mumbai Metro Depot, Taloja
  • Unloading of metro coaches on rails at ground level

Challenges

  • Permission for civil work was taken from private landowners & local authorities.
  • Road transportation through Mumbai City was done with proper coordination with traffic police & various government authorities.
  • Aligning of 2 cranes with rails at the site to receive metro coaches
  • Coordination with the shipping lines for timely arrangement of axles at Port

Project Execution

The Navi Mumbai Metro project is part of the rapid transit rail system for the city.

When Total Movements was appointed as the on-shore logistics service provider for transportation of these metro coaches from Mumbai Port to Navi Mumbai Metro Depot, a proper planning and technical study was done for safe execution of this project.

Technical Study includes axle configuration with spacer, trailer stability, and lashing calculations.

When conducted proper planning & technical studies for the safe execution of this project-including axle configuration with spacer, trailer stability, and lashing calculations.

The crucial challenges faced were detailed route surveys through the busy roads of Mumbai, deploying numerous specialised trailers at once, the building of temporary roads as none of the main roads had the clearance required for safe movement & coordination with traffic police/multiple government authorities for smooth transportation through the city. Permission was obtained for civil work & the same was executed to avoid any delay in transportation.

All 6 metro coaches were loaded on axles & secured with lashing for safe transportation. Night movement were done to avoid traffic. Unloading of metro coaches was done successfully by aligning 2 cranes with rails at ground level.

With detailed route surveys, swept path analysis, accurate  lifting plans, and seamless coordination, our team managed to overcome the challenges, & delivered the coaches by unloading them on rails.